The residents of this wonderful home were interested in building a bathroom and closet in their attic. There was no previous bathroom in the attic, so the job was to build a new bathroom from scratch.
The basement of this large and beautiful home was not finished and the homeowners were ready to complete their basement, which would include a bathroom, a large seating area, and installation of a refrigerator and cabinetry. The homeowners wanted to increase the practicality of their large basement and convert it into a space that could be utilized more often and more effectively.
The owner is this home was eager to remodel their bathroom and adjacent bar area. The design was becoming stale to the resident and was in need of a major change. Regency began by gutting the kitchen, removing all floor, walls, cabinetry, and fixtures.
he residents of this beautiful home were interested in building a bathroom in their attic, which was a finished area with a bedroom. There was no preexisting space for a bathroom to be installed, so Regency began by building the walls required to have a bathroom and installing any necessary plumbing and electrical necessary for a toilet, shower, sink, lights, and more.
The homeowners were in need of a major renovation on the entire first floor of their lovely home. The kitchen was laid out in a confined and boxed in manner, not allowing for entertaining in the kitchen.
Regency removed the existing vinyl siding, soffit & fascia, freeze board, window caps and gutters. We then installed Tyvek house wrap and foam insulation.
Attic Bathroom Remodel in Chicago
Attics, Basements & Other Rooms, Bathroom Remodels, Chicago, IL BY PJ RyanThe residents of this wonderful home were interested in building a bathroom and closet in their attic. There was no previous bathroom in the attic, so the job was to build a new bathroom from scratch.
Basement Remodel in Palatine, IL
Attics, Basements & Other Rooms, Basement Remodels, Bathroom Remodels, Palatine, IL BY PJ RyanThe basement of this large and beautiful home was not finished and the homeowners were ready to complete their basement, which would include a bathroom, a large seating area, and installation of a refrigerator and cabinetry. The homeowners wanted to increase the practicality of their large basement and convert it into a space that could be utilized more often and more effectively.
Interior Remodel in North Barrington, IL
Bathroom Remodels, Interior Remodels, North Barrington, IL BY PJ RyanThe owner is this home was eager to remodel their bathroom and adjacent bar area. The design was becoming stale to the resident and was in need of a major change. Regency began by gutting the kitchen, removing all floor, walls, cabinetry, and fixtures.
Attic Bathroom Remodel in Evanston, IL
Attics, Basements & Other Rooms, Evanston, IL BY PJ Ryanhe residents of this beautiful home were interested in building a bathroom in their attic, which was a finished area with a bedroom. There was no preexisting space for a bathroom to be installed, so Regency began by building the walls required to have a bathroom and installing any necessary plumbing and electrical necessary for a toilet, shower, sink, lights, and more.
First Floor Remodel in Buffalo Grove, IL
Buffalo Grove, IL, Interior Remodels, Kitchen Remodels BY PJ RyanThe homeowners were in need of a major renovation on the entire first floor of their lovely home. The kitchen was laid out in a confined and boxed in manner, not allowing for entertaining in the kitchen.
Vinyl Siding in Chicago
Chicago, IL, Siding & Exteriors BY PJ RyanRegency removed the existing vinyl siding, soffit & fascia, freeze board, window caps and gutters. We then installed Tyvek house wrap and foam insulation.